Orlando ground-up construction.

A ground-up project separates land cost, future work, borrower capital and total commitment.

Illustrative scenario

Illustrative transaction — not an actual Palermo closing. All figures, dates, structures and outcomes are hypothetical.

Conceptual residential construction shell showing concrete and masonry
Architectural illustration
Residential developmentCentral Florida

01 / The challenge

The initial challenge.

A hypothetical developer is planning a non-owner-occupied residential investment project. The scenario needs a coherent funding plan from site acquisition through completion, with a budget that separates land, work, soft costs and contingency.

02 / The structure

The financing structure.

Total hypothetical project cost is $1,800,000: $600,000 for land and $1,200,000 for construction, soft costs and contingency. A $1,200,000 first-lien commitment is split into $400,000 at closing and an $800,000 future-advance holdback. The borrower supplies $600,000 across the project, including $200,000 toward land and $400,000 toward the remaining budget. Full-commitment LTC is 66.67%; LTV against a $2,400,000 hypothetical as-completed value is 50.00%. Financing costs are excluded from this simplified project budget and require separate capital.

50.00%

Hypothetical LTV

$1,200,000 ÷ $2,400,000
66.67%

Hypothetical LTC

$1,200,000 ÷ $1,800,000

LTV uses the explicitly stated property-value basis. LTC uses the stated total project cost. These sample ratios do not establish lending limits.

03 / Key considerations

Key considerations.

  • Understand the plans, permit status and contractor’s proposed delivery schedule.
  • Define when borrower capital is contributed and how later advances are requested.
  • Distinguish a potential finished value from verified current collateral value.

04 / Hypothetical sequence

From first question to proposed exit.

An illustrative order of events, without a promised closing or construction schedule.

  1. 01

    Planning

    Site, scope, plans and the hypothetical $1.8 million budget are assembled.

  2. 02

    Initial funding

    The example assumes $400,000 is advanced against the site acquisition.

  3. 03

    Construction

    The $800,000 holdback and $400,000 further borrower contribution fund the remaining $1.2 million budget.

  4. 04

    Exit

    The fictional completed property is sold within the 18-month sample term.

05 / Hypothetical outcome

Hypothetical outcome.

The example ends with a completed investment property and repayment from sale. Figures illustrate a financing structure and are not Palermo program limits or offered terms.

Illustrative transaction — not an actual Palermo closing.