Skip to content
Palermo/Sarasota, Florida / Construction completion

Sarasota, Florida / Construction completion

Sarasota construction completion.

A project already underway is modeled with a debt payoff and a separate completion holdback.

Illustrative scenario

Illustrative transaction — not an actual Palermo closing. All figures, dates, structures and outcomes are hypothetical.

Conceptual residential construction shell showing concrete and masonry
Architectural illustration
Residential developmentGulf Coast

01 / The challenge

The initial challenge.

A fictional investment development is partially built. The review needs to reconcile existing debt, work already performed, the remaining construction budget and the route to a completed, saleable property. A finished-value estimate alone would leave too many unanswered questions.

02 / The structure

The financing structure.

The sample uses a $1,000,000 total commitment: $600,000 initial funding to retire existing debt and a $400,000 holdback for completion. Total project cost is $1,500,000, comprising $1,100,000 already incurred and $400,000 remaining. At full funding, commitment divided by project cost is 66.67% LTC; commitment divided by the hypothetical $2,000,000 as-completed value is 50.00% LTV. The initial advance is 60.00% of commitment; an initial as-is LTV is not calculated because no current value is supplied.

50.00%

Hypothetical LTV

$1,000,000 ÷ $2,000,000
66.67%

Hypothetical LTC

$1,000,000 ÷ $1,500,000

LTV uses the explicitly stated property-value basis. LTC uses the stated total project cost. These sample ratios do not establish lending limits.

03 / Key considerations

Key considerations.

  • Reconcile incurred costs, debt, borrower capital and the remaining budget.
  • Review existing work and the status of permits and contractor arrangements.
  • Keep future advances tied to the applicable written conditions and documented progress.

04 / Hypothetical sequence

From first question to proposed exit.

An illustrative order of events, without a promised closing or construction schedule.

  1. 01

    Scenario

    Current stage, debt and remaining work are described.

  2. 02

    Review

    The $1.5 million total budget and $400,000 cost to complete are reconciled.

  3. 03

    Initial funding

    The example assumes $600,000 is advanced to retire the prior debt.

  4. 04

    Completion and exit

    The fictional holdback is advanced subject to conditions; a completed-property sale repays the funded balance.

05 / Hypothetical outcome

Hypothetical outcome.

The hypothetical project reaches completion and is sold within the sample term. The timeline is illustrative and does not represent a real draw approval, inspection or Palermo closing.

Illustrative transaction — not an actual Palermo closing.

Discuss your loan